Located near the Sonoma County Airport, our team, in collaboration with talented designers and government agencies, successfully developed and delivered this state-of-the-art warehouse. This 27,790 square foot Concrete Precast building offers an industrial facility that seamlessly integrates modern features with sustainable technologies. Designed with functionality in mind, the building includes four bathrooms tailored for both office and warehouse staff, ensuring convenience across all areas of operation. The facility also features a fully operational loading dock with hydraulic dock levelers, enhancing efficiency in material handling. In addition to the construction, extensive site work was carried out to meet the facility’s operational demands, including the installation of a new garbage enclosure to support effective waste management and maintain a clean, organized environment.
“I have nothing but positive comments about Harkey Construction. They were the general contractors on a MAJOR new construction project and the workmanship and care was world-class. The entire Harkey team, including all of their subs, did incredible work. I still can’t believe how well everything turned out. This is truly the level of craftsmanship that I thought was no longer obtainable in the U.S. I recommend them whole-heartily.”